Operation Experience
Long-term experience of AQUACHLOR operation in Russia and abroad demonstrated:
Field experience
First AQUACHLORs were manufactured in 1998. During two recent years over 200 AQUACHLOR devices were installed at various sites.
Modularity allows to install the necessary number of AQUACHLOR devices at every water treatment station. For example: at the Engels Water Treatment Station 16 AQUACHLOR devices with oxidants’ (chlorine equivalent) total output capacity of 8kg/hour (192 kg/24 hours) disinfect 125000 cubic meters of drinking water per 24 hours. In the city of Krasnoarmeisk one AQUACHLOR-500 device with oxidants output capacity of 0,5 kg/h (12 kg/24 h) provides complete suppression of bacterial constituent in 25000 cubic meters of treated wastewater. In the city of Gavrilov Yam eight AQUACHLOR-500 devices disinfect wastewater of petroleum refinery. In Novosibirsk, Orenburg, London AQUACHLOR devices successfully operate in large swimming pools (over 2000 cubic meters). |
|||||||
> Devices Aquachlor Operation Experience |
|||||||
|
© All rights reserved
|
|||||||